This 2,000 foot project connected into the Second Avenue North project previously completed by American. The pavement along six blocks of Second Street North was rehabilitated. Three of the blocks had brick pavement while the other three blocks were asphalt. The asphalt pavement was reconstructed as an asphalt roadway with brick in the intersections. City utilities (water and gravity sewer) were replaced and upgraded. Additional drainage inlets were added to reduce localized flooding. All overhead utilities were buried and decorative street lights were added. Burying the overhead utilities required extensive and lengthy utility coordination. Sidewalks were provided along both sides of Second Street North where missing. A permit exemption was received from Southwest Florida Water Management District (SWFWMD). Design was completed in 2004 with construction completed in 2005.
American provided full engineering services for the project including roadway, drainage, utility, lighting and survey.