American provided roadway design and CEI services for a $27.5 Million dollar project that included a new AASHTO bridge structure crossing Florida’s Turnpike through the St Lucie Service Plaza. The project included 24” driven pile foundations and utilized type IV prestressed girders up to 125 ft long the project also included construction of 1.2 miles of a four lane arterial roadway along Crosstown Parkway. Additional services included; utility construction, drainage, roadway construction, asphalt concrete pavement, driven pile foundations, AASHTO bridge construction, lighting, signalization, pavement markings and landscaping.