This project involved the widening of 0.6 miles along Main Street in New Port Richey. The existing two-lane urban road was improved to three-lane with sidewalk and curb and gutter. The sidewalk is being added along the south side of the roadway to accommodate existing pedestrian traffic. American was responsible for all aspects of the roadway design including drainage, signing and marking, utility coordination, geotechnical investigations, environmental study, mitigation of wetlands, pond site study, right-of-way mapping, permitting and public involvement.