This project consists of constructing a four-lane divided roadway. The roadway will have ten foot shoulders, of which five feet will be paved, and be separated by a 40-foot depressed median. The project will require open drainage with ditches and storm water treatment ponds. At the Begin Project, the widening will be full-width, stubbed-out to match the future adjacent project segment. The west-shifted alignment will be maintained and adjusted at the north end of the project to match the existing four-lane roadway at the I-10 interchange. Also included was the design of an over flow pipe to alleviate the flooding in the area of Blue Lake.