American is preparing a preliminary engineering report and final design for a two lane divided urban section of Sunset Point Road (CR 576) from US Alternate 19 (Edgewater Drive) to Keene Road. The report will include a traffic study to determine if the roadway meets the level of service (LOS) requirements, an evaluation and feasibility of adding bike lanes, stormwater improvements, curb and intersection improvements, environmental impacts, a Bridge Development Report (BDR) and a Bridge Hydraulics Report (BHR) to determine the appropriate bridge replacement structure at Spring Branch Creek. American will provide final design services based on the recommendation of the preliminary engineering report.